{"id":605,"date":"2021-03-16T17:56:15","date_gmt":"2021-03-16T21:56:15","guid":{"rendered":"https:\/\/piscatawayhills.org\/?p=605"},"modified":"2021-03-16T17:56:15","modified_gmt":"2021-03-16T21:56:15","slug":"md-210-at-kerby-hill-road-livingston-road-interchange-construction-project-update","status":"publish","type":"post","link":"https:\/\/piscatawayhills.org\/md-210-at-kerby-hill-road-livingston-road-interchange-construction-project-update\/","title":{"rendered":"MD 210 at Kerby Hill Road \/ Livingston Road – Interchange Construction Project Update"},"content":{"rendered":"\n

2021 Project Update #6<\/p>\n\n\n\n

(All work is performed emergency, manpower, and progress permitting; equipment used for construction may be disruptive)<\/strong><\/p>\n\n\n\n

* Begin parapet construction on bridge S-1 over MD 210 SB
* Continue to pour sidewalk at the new Kerby Hill Rd. alignment<\/p>\n\n\n\n

* Continue with barrier wall construction at MD 210 median Looking ahead to next week<\/strong>:<\/p>\n\n\n\n

\u2022 Continue with signal\/electrical work at Murray Hill & Livingston.<\/p>\n\n\n\n

For more information about this project, please contact Mr. David Jackson, SHA Project Engineer at djackson2@mdot.maryland.gov or Ms. Amy Andrews, SHA District 3 Area Engineer at aandrews@mdot.maryland.gov.<\/p>\n\n\n\n

For a video rendering about the MD 210 interchange project, please click here:<\/p>\n\n\n\n

http:\/\/bit.ly\/2VP4izY<\/p>\n\n\n\n

For information on the detour routes for WMATA\u2019s D13 and D14 bus routes, please click here: https:\/\/www.wmata.com\/service\/status\/details\/temp-stop-closure-detour-md-210- proj.cfm<\/p>\n\n\n\n

To be added to the project email list, send an email to: cbishop@mdot.maryland.gov<\/p>\n","protected":false},"excerpt":{"rendered":"

2021 Project Update #6 (All work is performed emergency, manpower, and progress permitting; equipment used for construction may be disruptive) * Begin parapet construction on bridge S-1 over MD 210 SB* Continue to pour sidewalk at the new Kerby Hill Rd. alignment * Continue with barrier wall construction at MD 210 median Looking ahead to<\/p>\n

Read More<\/a><\/div>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[28],"tags":[8],"_links":{"self":[{"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/posts\/605"}],"collection":[{"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/comments?post=605"}],"version-history":[{"count":1,"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/posts\/605\/revisions"}],"predecessor-version":[{"id":606,"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/posts\/605\/revisions\/606"}],"wp:attachment":[{"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/media?parent=605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/categories?post=605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/piscatawayhills.org\/wp-json\/wp\/v2\/tags?post=605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}