{"id":605,"date":"2021-03-16T17:56:15","date_gmt":"2021-03-16T21:56:15","guid":{"rendered":"https:\/\/piscatawayhills.org\/?p=605"},"modified":"2021-03-16T17:56:15","modified_gmt":"2021-03-16T21:56:15","slug":"md-210-at-kerby-hill-road-livingston-road-interchange-construction-project-update","status":"publish","type":"post","link":"https:\/\/piscatawayhills.org\/md-210-at-kerby-hill-road-livingston-road-interchange-construction-project-update\/","title":{"rendered":"MD 210 at Kerby Hill Road \/ Livingston Road – Interchange Construction Project Update"},"content":{"rendered":"\n
2021 Project Update #6<\/p>\n\n\n\n
(All work is performed emergency, manpower, and progress permitting; equipment used for construction may be disruptive)<\/strong><\/p>\n\n\n\n * Begin parapet construction on bridge S-1 over MD 210 SB * Continue with barrier wall construction at MD 210 median Looking ahead to next week<\/strong>:<\/p>\n\n\n\n \u2022 Continue with signal\/electrical work at Murray Hill & Livingston.<\/p>\n\n\n\n For more information about this project, please contact Mr. David Jackson, SHA Project Engineer at djackson2@mdot.maryland.gov or Ms. Amy Andrews, SHA District 3 Area Engineer at aandrews@mdot.maryland.gov.<\/p>\n\n\n\n For a video rendering about the MD 210 interchange project, please click here:<\/p>\n\n\n\n http:\/\/bit.ly\/2VP4izY<\/p>\n\n\n\n For information on the detour routes for WMATA\u2019s D13 and D14 bus routes, please click here: https:\/\/www.wmata.com\/service\/status\/details\/temp-stop-closure-detour-md-210- proj.cfm<\/p>\n\n\n\n To be added to the project email list, send an email to: cbishop@mdot.maryland.gov<\/p>\n","protected":false},"excerpt":{"rendered":" 2021 Project Update #6 (All work is performed emergency, manpower, and progress permitting; equipment used for construction may be disruptive) * Begin parapet construction on bridge S-1 over MD 210 SB* Continue to pour sidewalk at the new Kerby Hill Rd. alignment * Continue with barrier wall construction at MD 210 median Looking ahead to<\/p>\n
* Continue to pour sidewalk at the new Kerby Hill Rd. alignment<\/p>\n\n\n\n